Baichy Heavy Industrial Machinery Co., Ltd
Phone/Wechat/Whatsapp:+008615093222637
24 hours online

Baichy Heavy Industry Invites You To Attend The 2025 Moscow Crocus Expo

2025-03-17 15:34:09
Baichy
plays
Warm Tip:

If you want to know more details about equipment, solutions, etc, please click the button below for free consultation, or leave your requirements!

Baichy Heavy Industry Invites You To Attend The 2025 Moscow

 

Core Value of the Exhibition——Why choose Crocus Expo?

 
✅ ​The largest trade platform in Eastern Europe: the purchasing decision-making center of Russia and the CIS, covering a market of 300 million people, held at the same time as the CTT Engineering Machinery Exhibition and the Logistics Exhibition, sharing more than 70,000 professional buyers.
​Policy dividend window period: Russia's infrastructure and mining development are accelerating, and the demand for localized equipment is surging. China's technology + cost-effectiveness advantage seizes the opportunity.
​One-stop trade closed loop: The exhibition hall is directly connected to the subway and airport, adjacent to Crocus City Mall (the largest commercial complex in Europe), and business negotiations and resource docking are efficient and convenient.
 

​Highlights of Baichy Heavy Industry's Exhibition——Hard-core strength, precise breakthrough

 
"Full-scenario mining solution" global debut
 
1. Extreme cold challenge: -40℃ low-temperature hydraulic system, dust-proof and shock-proof structural design, customized for Siberian mines;
 
2. Intelligent upgrade: equipped with a remote operation and maintenance platform, real-time monitoring of equipment status, reducing Russian customers' operation and maintenance costs by 30%+;
 
3. Localization adaptation: Provide Russian operation interface, CE/EAC dual certification, support ruble settlement, and avoid trade barriers.
 

"Central Asian Success Case" Strength Endorsement

 
1. Kazakhstan Copper Mine Project: A single jaw crusher operated continuously for 12,000 hours without failure, and the production capacity increased by 45%;
 
2. Uzbekistan Sand and Gravel Line: EPC general contracting service shortened the construction period by 60 days and was awarded the "Best Partner" by the local government.
 

"Zero-distance service" commitment

 
1. Russian local technical team on-site, 24-hour response;
 
2. Parts warehouses are located in Moscow and Novosibirsk, and emergency needs can be delivered within 48 hours;
 
3. Participants will enjoy the "first year warranty + free operation training" limited-time policy.
 
[Booth information & reservation benefits] ​
Booth number: C6059
Time: April 23-25, 2025